ICE MACHINE & ICE/WATER DISPENSER PLANNING CHECKLIST

January 13, 2026

Summary

Pre-Purchase + Pre-Installation Readiness Guide

Use this checklist before selecting, ordering, or relocating any commercial ice machine or ice & water dispenser.

1. FACILITY & USE PROFILE

Facility type identified:
☐ Hospital / VA
☐ K-12 School
☐ Higher Education
☐ Restaurant / Foodservice
☐ Federal / Government
☐ Industrial / Manufacturing

☐ Is this a patient care / clinical area?

Who will primarily use this station?
☐ Staff
☐ Students
☐ Patients
☐ Public / guests

☐ Ice is classified as food under your local health authority

2. ICE DEMAND & CAPACITY SIZING

Estimated people served per day: _______
Estimated patients/beds (if healthcare): _______

Usage level:
☐ Light
☐ Standard
☐ Heavy
☐ Inpatient clinical

Peak demand occurs during:
☐ Meal periods
☐ Shift changes
☐ Continuous 24/7 use

☐ Storage bin sized to handle peak usage
☐ Redundancy considered for mission-critical areas

3. ICE TYPE SELECTION

☐ Nugget / chewable ice
☐ Full cube
☐ Half cube
☐ Flake
☐ Mixed application required

Ice type matches:
☐ Beverage quality expectations
☐ Patient safety needs
☐ Food display requirements

4. DISPENSING METHOD & WORKFLOW

☐ Ice-only dispenser
☐ Ice & water combo dispenser
☐ Modular ice head + bin
☐ Undercounter ice machine

☐ Touch-free dispensing required?
☐ Scooping controls in place (if applicable)
☐ ADA reach height confirmed (if public station)

5. WATER QUALITY & FILTRATION

☐ Water source verified (city, well, RO, etc.)
☐ Water hardness known or tested
☐ Scale buildup currently exists elsewhere in building

☐ Dedicated ice machine filter selected
☐ Hard water treated with proper scale prevention
☐ Filtration meets manufacturer warranty requirements
☐ Filter change schedule defined

6. DRAINAGE & PLUMBING

☐ Floor drain within gravity range
☐ Proper drain slope verified
☐ Air gap/backflow prevention installed
☐ Drain pump required (if no floor drain)
☐ Venting required and accounted for
☐ Drain line freezing risk evaluated
☐ Drain meets UPC/IPC/local code

7. ELECTRICAL & MECHANICAL REQUIREMENTS

☐ Voltage confirmed
☐ Phase confirmed
☐ Amperage available
☐ Dedicated circuit provided
☐ GFCI required (if applicable)

☐ Heat rejection from air-cooled unit accounted for
☐ Remote condenser required (if applicable)

8. INFECTION CONTROL & HEALTHCARE SAFETY (If Applicable)

☐ Touchless dispensing selected
☐ Bin access allows full sanitation
☐ Biofilm prevention plan in place
☐ Ice scoops stored in sanitary holders
☐ Staff cleaning procedures documented

☐ Joint Commission inspection requirements reviewed
☐ VA / hospital infection control policies reviewed

9. INSTALLATION & PROJECT COORDINATION

☐ Equipment dimensions confirmed
☐ Path of travel verified for delivery
☐ Ceiling height and door clearances checked
☐ Freight access planned (dock, lift gate, crane)

☐ Startup & commissioning scheduled
☐ Equipment anchored if required
☐ Staff training planned

10. SERVICE, MAINTENANCE & LIFE-CYCLE COST

☐ Preventive maintenance plan in place
☐ Cleaning frequency defined
☐ Sanitization staff assigned
☐ Evaporator & bin inspection interval set

☐ Service provider identified
☐ Emergency downtime response defined
☐ Expected service life budgeted

11. CODES, COMPLIANCE & INSPECTIONS

☐ NSF certified
☐ FDA Food Code compliant
☐ State/local health department compliant
☐ ADA compliant (if public station)

☐ Electrical code compliant
☐ Plumbing code compliant
☐ Fire code clearance verified

12. PROCUREMENT & CONTRACT VEHICLE

Purchasing through:
☐ GSA MAS
☐ FedMall
☐ State / Cooperative contract

☐ Contract pricing verified
☐ Buy American requirements reviewed
☐ Delivery timing aligned with project phase

13. RISK RED FLAGS (CRITICAL REVIEW)

☐ No nearby floor drain
☐ Hard water with no filtration
☐ Noise-sensitive location with air-cooled unit
☐ High-usage area with under-sized machine
☐ No PM agreement in place
☐ No infection-control plan
☐ Unknown electrical service
☐ No installation coordination

14. FINAL READINESS CONFIRMATION

☐ Equipment type selected
☐ Capacity verified
☐ Utilities verified
☐ Filtration selected
☐ Drainage approved
☐ Codes reviewed
☐ PM plan assigned
☐ Procurement vehicle confirmed
☐ Install coordination scheduled