GC Pre-Construction Coordination Sheet

Summary

Dishroom, Hood, Utilities, & Waste Systems

Project Name: ______________________________

Location: _________________________________

Owner: ___________________________________

GC / CM: _________________________________

Date: ___________________________________

1. DISH MACHINE SCOPE CONFIRMATION

Item Responsible Party Verified
Dish machine model & type approved ☐ Dealer / ☐ Owner
Sanitizing method (Heat or Chemical) ☐ Dealer
NSF documentation submitted ☐ Dealer
Rack capacity sized for peak ☐ Dealer
Machine delivery path verified ☐ GC
Install date coordinated ☐ GC
Clearances verified on drawings ☐ GC

2. ELECTRICAL COORDINATION

Item Responsible Party Verified
Voltage & phase confirmed ☐ Electrician
Circuit size confirmed ☐ Electrician
Dedicated disconnect location ☐ Electrician
Booster heater power ☐ Electrician
Chemical pump power ☐ Electrician
Emergency stop circuits ☐ Electrician
Fire system shunt trip ☐ Electrician

3. PLUMBING & DRAINAGE COORDINATION

Item Responsible Party Verified
Hot water supply temp & GPM ☐ Plumber
Cold water supply ☐ Plumber
Indirect drain & air gap ☐ Plumber
Floor sinks installed ☐ Plumber
Backflow preventers ☐ Plumber
Grease interceptor location ☐ Plumber
Pulper discharge coordination ☐ Plumber / ☐ GC

4. BOOSTER HEATER / MECHANICAL SYSTEMS

Item Responsible Party Verified
Booster heater type (gas/electric) ☐ Mechanical
Booster sizing confirmed ☐ Dealer / ☐ Mechanical
Gas line sizing (if applicable) ☐ Mechanical
Exhaust/venting ☐ Mechanical
Temp rise verified ☐ Dealer (commissioning)

5. WATER TREATMENT COORDINATION

Item Responsible Party Verified
Water hardness testing ☐ Water Provider
Softener installed ☐ Water Provider
Carbon filter (if required) ☐ Water Provider
RO system (if applicable) ☐ Water Provider
Delime schedule posted ☐ Owner

6. HOOD SYSTEM COORDINATION

🔴 BELOW CEILING vs 🔵 ABOVE CEILING

🔴 BELOW CEILING (Kitchen Side)

Item Responsible Party Verified
Hood canopy & mount ☐ Mechanical
Hood lighting ☐ Mechanical
Grease baffles ☐ Mechanical
Fire nozzles ☐ Fire Suppression
Clearance to dish machine ☐ Dealer / ☐ Mechanical

🔵 ABOVE CEILING (Ducts, Fans, Makeup Air)

Item Responsible Party Verified
Exhaust duct ☐ Mechanical
Roof fan ☐ Mechanical
Makeup air unit (MAU) ☐ Mechanical
Electrical to fan/MAU ☐ Electrician
Gas to MAU ☐ Mechanical
Fire wrap & detection ☐ Fire Suppression
Roof penetrations & curb ☐ GC
TAB air balance report ☐ Mechanical

7. FIRE SUPPRESSION SYSTEM

Item Responsible Party Verified
Nozzle layout ☐ Fire Suppression
Manual pull station ☐ Fire Suppression
Detection cable ☐ Fire Suppression
Shunt trip coordination ☐ Fire / ☐ Electrician
AHJ fire inspection ☐ GC

8. CHEMICAL SYSTEMS (IF LOW-TEMP OR WASH CHEMISTRY)

Item Responsible Party Verified
Chemical provider assigned ☐ Owner
Pumps installed ☐ Chemical Provider
Tubing routed ☐ Chemical Provider
SDS binder delivered ☐ Chemical Provider
Test strips provided ☐ Chemical Provider
Calibration scheduled ☐ Chemical Provider

9. WASTE SYSTEMS (SCRAP, PULPER, DEHYDRATOR)

Item Responsible Party Verified
Scrap trough ☐ Plumber
Pulper installation ☐ Dealer / ☐ Plumber
Pulper discharge permit ☐ GC
Dehydrator power ☐ Electrician
Dehydrator venting ☐ Mechanical
Hauling contract ☐ Owner

10. COMMISSIONING & TURNOVER COORDINATION

Item Responsible Party Verified
Live wash test scheduled ☐ Dealer
Chemical calibration ☐ Chemical Provider
Water treatment verification ☐ Water Provider
Temp/ppm logs issued ☐ Dealer / ☐ Owner
Staff training scheduled ☐ Dealer / ☐ Owner
Warranty registration ☐ Dealer
Final inspection scheduled ☐ GC

PRE-CONSTRUCTION SIGN-OFF

By signing below, all parties confirm scope alignment, responsibility ownership, and readiness for construction:

GC / CM: ___________________________ Date: __________
Dealer: ____________________________ Date: __________
Mechanical: ________________________ Date: __________
Plumbing: __________________________ Date: __________
Electrical: _________________________ Date: __________
Fire Suppression: ___________________ Date: __________
Owner / Facilities: _________________ Date: __________

ALDEVRA COORDINATION RULE

If it is not checked, it is not coordinated. If it is not coordinated, it will fail during inspection, create change orders, or delay opening.