Summary
A step-by-step guide for planning equipment replacements, layout improvements, and summer installations
This kit helps School Food Service Directors make smart, budget-friendly decisions as they plan kitchen upgrades for 2025 and beyond.
Use it for:
- Annual planning
- USDA Equipment Grant applications
- Summer project scheduling
- Replacement forecasting
- Lunch line improvement planning
Upgrade Readiness Checklist
Is it time to upgrade? Use this quick assessment:
Heavy Equipment:
□ Oven not holding temp
□ Warmers losing heat or drying food
□ Dish machine delays
□ Serving line wells failing or uneven
□ Walk-in struggling to recover at peak times
□ Frequent repairs (2+ per year)
□ Parts becoming hard to source
□ Utility mismatches with newer models
Light Equipment:
□ Microwaves heating unevenly
□ Blenders/mixers losing power
□ Food processor dull/blade issues
□ Countertop warmers inconsistent
□ Repeated outages during service
Operational Flow:
□ Long lunch lines
□ Students crossing paths
□ Congested entry or POS points
□ Milk cooler or condiment station backups
□ Insufficient grab-and-go access
If you checked:
- 5+ boxes → Plan upgrades this year
- 3–4 boxes → Plan for summer
- 1–2 boxes → Monitor and budget
- 0 boxes → You’re in great shape
Inventory & Condition Assessment
Use this chart annually:
Aldevra can help fill this out during a free walkthrough.
Budget Planning Tool
Use this planning table to allocate funds:
Need help estimating? Aldevra provides no-cost exact/equal recommendations and itemized quotes.
Priority Setting Framework
1. Must-Do (Safety & Compliance)
- Refrigeration failures
- Dish sanitation issues
- Equipment not meeting USDA requirements
- Broken or unsafe equipment
2. Should-Do (Efficiency & Speed)
- Lunch line slowdowns
- Aging ovens/warmers
- Outdated small appliances
- Layout causing cross-traffic
3. Could-Do (Enhancements)
- Grab-and-go line
- Scratch cooking upgrades
- Merchandising improvements
- Digital menu displays
Aldevra helps schools categorize upgrades during onsite visits.
Sample Summer Upgrade Timeline
March–April
- Conduct equipment walkthrough
- Identify priority upgrades
- Confirm utilities
- Begin grant applications (USDA/state)
- Request quotes from Aldevra
May
- Finalize purchase orders
- Schedule installation dates
- Coordinate with facilities team
June–July
- Delivery & installation
- Utility connection verification
- Removal of outdated equipment
- Staff training on new equipment
August
- Final kitchen reset
- Menu testing
- Grab-and-go stocking plan
- Back-to-school readiness check
Aldevra books summer installations early—this timeline helps districts plan ahead.
Kitchen Layout Optimization Guide
Serving Line Layout:
□ Clear entry & exit
□ No cross-traffic
□ POS placed at natural flow point
□ Milk cooler positioned after meal pickup
□ Two-sided access where possible
Back-of-House Layout:
□ Smooth flow: receiving → storage → prep → cook → hold → serve
□ Sufficient prep table space
□ Walk-ins close to prep
□ Scrape area separated from prep
□ Light equipment placed at staff height
Grab-and-Go Layout:
□ Merchandiser at high visibility point
□ No bottleneck near POS
□ Access on both sides if possible
Aldevra includes line flow and layout recommendations with every major quote.
Equipment Replacement Planner
This tool because it supports 5-year capital planning.
Funding & Grants Guide
Common Funding Sources:
- USDA Equipment Assistance Grants
- State CN funding
- ARPA/CDBG (project dependent)
- Foodservice operating budget
- District capital funds
- Local wellness or foundation grants
Aldevra Provides:
- Exact/equal specs
- Quotes that meet grant requirements
- Assistance describing equipment benefits
Check out our Ready-to-use grant materials for additional support!
Light Equipment Starter Bundle Recommendations
For schools wanting scratch or fresh-prep capability:
- Commercial blender
- Food processor
- Immersion blender
- Countertop steamer
- Commercial microwave
- Portioning tools (spoodles, ladles, scales)
This complements heavy equipment upgrades.
Aldevra Kitchen Upgrade Consultation (Included)
Every planning kit comes with:
- On-site walkthrough
- Utility check
- Flow + layout review
- Exact/equal matches
- Budget-friendly recommendations
- Installation scheduling support
Local team. Fast turnaround. Federal-level quality.
Kalamazoo, Michigan
(269) 350-1337
Aldevra — Helping K-12 Schools Upgrade Smarter.


